Enhanced Linked Mode Is Deprecated in VCF 9.x: ELM Prerequisites Before Upgrading to VCF 9.1
For more than a decade, Enhanced Linked Mode (ELM) was how we joined vCenter instances together: one SSO domain, one inventory view, and roles, tags and licences shared across every member.
In VCF 9 that model is on its way out. Broadcom marked ELM as deprecated with vCenter 9.0, and the VCF 9.1 documentation and release notes still describe it that way, with removal planned for a future release.
ELM still works on 9.x, and that's deliberate: it lets existing environments upgrade. But it blocks the features VCF 9.1 is built around. You can't configure VCF Single Sign-On or add a vCenter to a vCenter linking group while it's still in ELM.
If you're planning a move to VCF 9.1, especially from VCF 5.2, ELM needs its own line in your plan. This post covers:
What ELM gave you and what replaces each piece in VCF 9.1
The ELM prerequisites to sort out before you upgrade
How to pick the right deactivation method, and the steps for each
How to link vCenter instances again in VCF Operations
The known issues worth knowing about up front
Why ELM is going away
ELM bundled several jobs into one feature, all tied to a shared vCenter SSO domain and directory replication between members. That design made every linked vCenter dependent on the others. Upgrades had to be coordinated across the whole ring, a broken replication partner could affect everyone, and backups only worked properly as offline snapshots of every member at the same time.
VCF 9 splits those jobs apart and moves them up to the fleet level, mostly into VCF Operations:
Identity moves to VCF Single Sign-On, run by the VCF identity broker.
Single pane of glass moves to vCenter linking: vCenter groups created in VCF Operations.
Roles are provisioned to other vCenter instances as vCenter custom roles from VCF Operations.
Tags are managed centrally with tag management in VCF Operations, which pushes tag categories to vCenter instances or custom vCenter groups.
Licensing is handled centrally in VCF Operations, not per SSO domain.

What ELM blocks in VCF 9.1
Broadcom's guidance is clear: before you use the new identity and linking features, ELM must be deactivated on all vCenter instances in the VCF instance.
VCF Single Sign-On, embedded mode: the identity broker runs inside the management domain vCenter. That vCenter must be on 9.1 or later, carry a VCF licence, and not be in ELM. Don't turn ELM back on after the broker is configured.
VCF Single Sign-On, instance mode: the identity broker runs as a VCF management service in the management domain. The same rule applies: the vCenter instances it serves can't be in ELM.
vCenter linking: no member of a vCenter group can be in ELM. VCF Operations only lists vCenter instances that are compatible.
Before the upgrade: ELM prerequisites checklist
The ELM break itself happens after the upgrade, because every member must already run 9.x. The preparation, though, needs to happen before you start. Leaving it until afterwards is how teams end up with lost roles, missing tags or users who can't log in.

1. Map your ELM topology
List every vCenter that shares the SSO domain, including any outside VCF (an ELM ring can hold up to 15 vCenter appliances).
In VCF 5.x, check each workload domain. A workload domain that joined the management SSO domain is in ELM with the management vCenter. A workload domain created with its own SSO domain is isolated and not in ELM.
Note which vCenter instances SDDC Manager manages and which are standalone. That decides the deactivation method later.
2. Record what ELM is sharing today
Once ELM is deactivated, shared configuration such as tags, roles and permissions stays local to each vCenter instance. Nothing is deleted, but nothing is kept in sync any more either. Export or document:
Custom roles and their privileges
Global permissions and the users and groups they reference
Tag categories, tags and the objects they're assigned to (backup tools, DRS rules, storage policies and automation often rely on them)
Content libraries that publish and subscribe between linked vCenter instances
Third-party plugins and solutions that expect a single SSO domain
3. Plan identity and permissions
Decide on embedded or instance mode for the VCF identity broker. Embedded mode is usually used within a single VCF instance; instance mode suits multi-instance fleets.
Pick one identity provider for every vCenter you plan to link. vCenter linking needs the same identity provider on every member, but permissions for those users and groups are not shared. You set them on each vCenter.
Know what VCF SSO changes once it's configured: identity sources are then managed only from VCF Operations; users and groups are never migrated and existing vCenter identity provider settings are overridden, so expect to redo some role assignments; SDDC Manager UI login accepts only local accounts (the API still accepts SSO users); in instance mode, PowerCLI integrations need to be set up again; and the user who configures VCF SSO needs the All Objects scope.
4. Check DNS and versions
Forward and reverse DNS must resolve between every vCenter you plan to link.
Plan to upgrade every member of the ELM ring. The deactivation tools only work when all members are running and on 9.x.
Embedded-mode VCF SSO needs the management domain vCenter on 9.1 or later.
5. Protect yourself with backups
Take offline (powered-off) snapshots of every vCenter in the ELM ring at the same time. Broadcom calls this the only proper way to back up vCenter instances in ELM, and it's the only supported way back to ELM if you need to revert. Yes, it means a short outage.
Take file-based backups of every vCenter and SDDC Manager as usual.
Snapshot SDDC Manager before any ELM work.
6. Don't break ELM early on VCF-managed vCenters
For vCenter instances that SDDC Manager manages, don't run the vCenter command-line utility on your own. SDDC Manager keeps track of which domains are joined to the management SSO domain. If its records and reality disagree (a state Broadcom calls ELM drift), upgrade prechecks and the later ELM tasks can fail. Use the SDDC Manager method after the upgrade, as shown below.
Choose the right deactivation method

Your situation | Method | Scope |
VCF 5.x upgraded to 9.x; vCenter instances managed by SDDC Manager | SDDC Manager API | All VCF-managed vCenters in the instance, at once |
Standalone vCenter or VVF 9.x in ELM | cmsso-util break-elm | The ELM ring, run from one member |
VCF-managed vCenters where cmsso-util was already used | Resolve ELM drift in SDDC Manager | Brings SDDC Manager back in line |
Method A: SDDC Manager API (upgraded VCF instances)
Prerequisites: SDDC Manager and every vCenter upgraded to 9.x, all vCenter instances running, and the offline snapshots from the checklist.
This operation deactivates ELM for every vCenter in the VCF instance. You can't choose a subset, and all calls target the management domain. You can run the calls from the SDDC Manager Developer Center or any REST client.
Get the management domain ID. Run GET /v1/domains and copy the ID of the management domain.
Validate the request. Run POST /v1/domains/{id}/validations with this body, then copy the validation ID:
{
"breakElmSpec": {
"isReconcileWorkflow": false
}
}Check the validation. Run GET /v1/domains/{id}/validations/{validationId}. Don't continue until it reports success.
Deactivate ELM. Run PATCH /v1/domains/{id} with the same breakElmSpec body. Copy the task ID.
Monitor the task. Run GET /v1/tasks/{taskId} until it completes.
When it finishes, each workload domain vCenter stands on its own SSO domain, and SDDC Manager's records match.
Method B: cmsso-util break-elm (standalone vCenter and VVF)
Prerequisites: every vCenter in the ring is powered on and on 9.x, you have offline snapshots of all of them taken together, and you have the SSO administrator password.
SSH to any vCenter in the ELM ring and open the Bash shell.
Run the pre-check, and fix anything it reports:
cmsso-util break-elm --mode pre-check --password '<sso-admin-password>'Wait for the message that the break ELM pre-checks completed successfully. The utility checks the local node first, then its peers.
Deactivate ELM:
cmsso-util break-elm --mode execute --password '<sso-admin-password>'Restart the vSphere Client service on every affected vCenter:
service-control --restart vsphere-uiLog out of the vSphere Client and log back in.
If the run fails on any node, fix the cause, then rerun the utility on each node that reported the failure.
The utility also switches off what depended on ELM, such as the single pane of glass and directory replication. Roles, tags and permissions stay where they are, local to each vCenter.
After the break: link vCenter instances in VCF Operations
vCenter linking is the VCF 9 replacement for the ELM inventory view. Members keep their own SSO domains, and VCF Operations manages the trust between them.
Requirements:
vCenter 9.0 or later on every member
2 to 15 vCenter instances per group
No member in ELM
Forward and reverse DNS between all members
The same identity provider on every member
A user with the vCenter Linking role (manage and view), plus vCenter Administrator rights when you enter the credentials by hand
Steps:
In VCF Operations, go to Operate → Administration → Configurations → Logical Groupings.
Open the vCenter Linking tile and click Create Group.
Enter a Group Name and an optional Description.
Select the vCenter instances from the list of compatible vCenters.
Click Finish and wait for the group to show as linked.
If linking fails, fix the cause and use Reset Linking.

You can later add or remove members, edit the group, or delete it. Keep in mind that a vCenter group does not sync roles, tags or global permissions. Use the tools built for those:
Roles: in VCF Operations, go to Manage → Fleet Management → Identity and Access → vCenter Custom Roles and click Import & Provision Roles. Pick a source VCF instance, vCenter and role, then the target VCF instances. If a role with the same name already exists, the source role overwrites it. This feature only supports vCenter instances from VCF 9.1 onward.
Tags: use tag management in VCF Operations to import existing tags and categories from your vCenter instances, then push categories to a single vCenter or to a custom vCenter group of type Tag Group.
Permissions: assign them on each vCenter for the users and groups from your common identity provider.
Known issues to plan for
Upgrade precheck fails with BREAK_ELM_ONLY_SUPPORTED_ON_JOINED_MGMT_SSO: SDDC Manager doesn't have the expected SSO join status recorded for the vCenter instances, which is common when ELM was broken outside SDDC Manager. Broadcom has a KB with the fix. Apply it, run the ELM drift resolution, then rerun the precheck.
SDDC Manager UI returns "Internal Server Error" after ELM is removed: the SDDC Manager service account has lost its permissions in vCenter. Broadcom's KB covers re-adding it to the right group and restarting the SDDC Manager services.
vCenter linking finds no valid vCenter instances: usually leftover ELM configuration. Check that each vCenter has a unique domain GUID and that ELM was fully removed, then try again.
Stale vCenter entries: after ELM is broken, VCF Operations and Lifecycle Manager views can still show old or duplicate vCenter entries for a while (9.1.2 known issue).
Content library VM template sync: in 9.1.2, content libraries can sync VM templates across vCenter instances linked in a vCenter group, without ELM. There is a known issue where syncing to a subscribed library fails with a permission error. Test it before you retire any ELM-based library workflows.
Quick summary
ELM is deprecated since vCenter 9.0. It still works on 9.x so that upgrades can happen, but VCF SSO and vCenter linking require it gone.
Do the homework before upgrading: topology, roles, tags, permissions, identity provider, DNS, and simultaneous offline snapshots.
Upgrade every ELM member to 9.x, then break ELM: with the SDDC Manager API for VCF-managed vCenters, and with cmsso-util break-elm for standalone and VVF.
Rebuild what ELM gave you with VCF SSO, vCenter linking, custom role provisioning and tag management in VCF Operations.



Comments